MSF Scheduled Maintenance Periods

January 3rd, 2018 by AJ4MQ

The MSF 60 kHz standard-frequency and time signal, broadcast by Babcock on behalf of NPL, is occasionally taken off-air to allow maintenance work on the masts and antennas at Anthorn Radio Station to be carried out in safety. This means that your radio-controlled clock will not be picking up the MSF signal, so may not be working correctly.

The dates and times of the forthcoming scheduled maintenance periods are as follows:

2018:

14 June 2018 from 10:00 to 14:00
13 September 2018 from 10:00 to 14:00
13 December 2018 from 10:00 to 14:00

2019:

14 March 2019 from 10:00 to 14:00
13 June 2019 from 10:00 to 14:00
12 September 2019 from 10:00 to 14:00
12 December 2019 from 10:00 to 14:00

The shutdowns will take place between 10:00 and 14:00 UTC in December and March, and between 10:00 and 14:00 BST in June and September.

The duration of each outage period will be kept to a minimum, and the signal may be back on-air prior to the times given above.

In addition to these dates, the signal is likely to be taken off-air for a two-day period during spring or summer each year, remaining off-air overnight. The dates of this longer outage will be announced on this page and by e-mailed notices to registered users as soon as they are known.

If you wish to be kept informed about planned outages, please complete and submit the E-mailed Notifications of Scheduled Maintenance Periods form.

Find out more about the MSF Radio Time Signal

Some common problems with radio-controlled clocks

Contact: communications@npl.co.uk

• Our thanks to Mike Terry for the above information

(SOUTHGATE)